 Economic and financial assessment        

Determination cost of the project

  Investments

Construction
The different constructions in the Center are preceded by some hardworking to facilitate the building activities of the firm constructor. The estimated cost of this hardworking is : 4.357.740 Fcfa.

a) Breeding building

The  building cost for breeding is estimated according to the surface to be built and the species of animals to breed:

       -  1 flat to breed free-range chickens (211m2) = 7.932.223F cfa.                  - 2 flats to breed laying hens(395x2 =790m2)  = 23.670.238 F cfa

        -1 flat to breed porks(230m2)                           = 7.490.350 Fcfa

                                                                                                                                   Total Breeding buildings    = 39.092.811 Fcfa

b-) Administration building

The administration flats cover a surface of 179 (m2) square meter; and the estimated cost is 22 710 121 F cfa.

c).Habitations for those in charge of the administration and for youngs in formation

Their  estimated cost is 51.029.170 Fcfa

d).Fire Protection + an “apatam” : 4 869 468 F cfa

Construction / Building expenditure 

DESIGNATION

AMOUNTS

Hardworking /“Gros oeuvres”

4  357 740

Habitations

51 029 170

Breeding building

39  092 811

Administration building

22  710 121

Fire Protection + “Apatam”

4  869 468

TOTAL

122 059 310

 


 

 

 


 

 

 

 